S5 to S7 migration

Expertise in migration from the Siemens S5 systems to the latest S7 systems. We have migrated some diverse S5 projects to the S7 platform. From converting S5-95U to IM151-7 to converting S5-155H to PCS7 we have done it all.

Some of our showcase projects:

Aegis Logistics Ltd.

This was done in collaboration for converting from S5-155H to the Siemens DCS – PCS7. The migration commissioning was done in record time of less than 2 hours since the system was controlling LPG tanks.

Visakapatnam Container Terminal Pvt. Ltd.

A mobile harbour crane (MHC) at VCTPL was working with the S5 slot PLC which failed. Since there was no support available for the PC based slot PLC, the MHC was initially made operational with the help of the available S5-155U in a very short time. Subsequently, the S5 PLC was updated with the S7 400 system along with the KTP1000 HMI. The operator console keyboard which had mechanical issues was transferred as Touch keys on the KTP1000 which obviates the need to change the keyboard. The MHC is fully operational with the S7-400 system